Construction Start Date: 15.06.2021
Construction Completion Date: 15.08.2022
Project Features: Outdoor pool, indoor pool, Generator, 2
elevators, barbecue area, children’s playground, security
camera and security area
Materials used in construction
Kale brand ceramic 1 class
Creavit and Creavit brand in WCs and Showers
Kitchen and bathroom cabinets mdflam special selection
Insulation 5 cm stone wool between 13 cm wall again
Between 13.5 again wall sound and heat insulation, waterproofing
for kame rubber two component riding insulation
Laminates agt brand 1 class
Air conditioning
American door in doors
Total Square Meters of Land: 2136 m2
Total Number of Flats: 49
Remaining Number of Flats : 28
18 units of 1+1 40-55 m2
2+1 6 pieces of 70 m2
1 duplex 140 m2 3+1
3 units of 80 m2 2+1 duplex